BLOG

BLOG2026-07-16T00:26:10+00:00

Dry ice blasting minimises chemical use and provides a higher quality clean

April 13th, 2020|Categories: Case Study, PRINTING|

COLD JET CASE STUDY Dry ice blasting minimises chemical use and provides a higher quality clean THE SITUATION InfoPrint Solutions Company was formed in 2007 as a result of a joint venture between IBM’s Printing [...]

Comments Off on Dry ice blasting minimises chemical use and provides a higher quality clean

Contractor quickly and safely removes asphalt from construction vehicles

April 13th, 2020|Categories: Case Study, CONTRACT CLEANING|

COLD JET CASE STUDY Contractor quickly and safely removes asphalt from construction vehicles THE SITUATION The largest road paving and heavy construction company in Ontario specialises in asphalt paving on highways and local roads throughout the [...]

Comments Off on Contractor quickly and safely removes asphalt from construction vehicles

Air Force base quickly and safely removes sealant from F-16 jet wing

April 13th, 2020|Categories: AEROSPACE & AVIATION, Case Study|

COLD JET CASE STUDY Air Force base quickly and safely removes sealant from F-16 jet wing THE SITUATION Hill Air Force Base near Ogden, Utah, is home to the Air Force Material Command’s Ogden Air Logistics Complex [...]

Comments Off on Air Force base quickly and safely removes sealant from F-16 jet wing

Injection moulder reduced maintenance cycles by 50%, reducing costs and downtime

April 6th, 2020|Categories: Case Study, PLASTIC & COMPOSITES|

COLD JET CASE STUDY Injection moulder reduced maintenancecycles by 50%, reducing costs and downtime THE SITUATION The Geiger Group is made up of Hans Geiger Spritzgießtechnik GmbH – located in Franken – Hans Geiger Formenbau GmbH [...]

Comments Off on Injection moulder reduced maintenance cycles by 50%, reducing costs and downtime

Facility saves 30-40% on energy costs

April 6th, 2020|Categories: Case Study, POWER GENERATION|

COLD JET CASE STUDY Facility saves 30-40% on energy costs THE SITUATION Manufacturers and service providers are feeling the effect of today’s energy expense and price increases. In the vast majority of industries, energy management has [...]

Comments Off on Facility saves 30-40% on energy costs

Fritz Jaspert effectively cleans waffle moulds without water or chemicals

April 6th, 2020|Categories: Case Study, FOOD & BEVERAGE|

COLD JET CASE STUDY Fritz Jaspert effectively cleans waffle moulds without water or chemicals THE SITUATION Frija waffle bakery, Fritz Jaspert KG was founded in 1913 in Westphalian Hamm, Germany. Today it is one of the [...]

Comments Off on Fritz Jaspert effectively cleans waffle moulds without water or chemicals
Go to Top